Something You Haven’t Seen Before
( Permalink )Have you wondered what’s going on below grade? While things are moving very fast from the 1st to 7th floors, work on the lower level of Alter has been something of a mystery. For the first time we are offered a peek into the level that contains the auditorium and four lecture halls. Below you see alternating concrete steps that form the floor of the 270 seat auditorium. Concrete workers will return to fill in the spaces between these risers in the days ahead. Have a Happy Thanksgiving from your Alter Blogger.


John DeAngelo