( Permalink )It’s been a while since we posted information on Alter Hall progress.  Since completing the steel frame, much of the work has moved inside, where it is harder to get photos while work is in progress. Plus, once construction passed the 3rd floor of Speakman Hall, we no longer had a vantage point for interior progress.
Soon I should be able to walk around the lower levels, and as time passes I may even be allowed to ride the construction elevator to the top!
 In the meantime, I can occasionally catch glimpses of what’s going on from the 3rd floor balcony and the rooftop. Today I captured crews pouring and finishing on the 3rd floor, and work has begun on duct work on the first floor.
3rd Floor Concrete from John DeAngelo on Vimeo.

John DeAngelo