Work Progressing on East Wall
( Permalink )Work is progressing on the eastern foundation wall of Alter Hall. Note the sheets of visqueen covering the lagging. Unlike the other walls, lagging is used as the outside form for the east wall, requiring a differnet type of bracing to pour concrete (seen at left).


John DeAngelo