Last Holes for “H” piles Drilled
( Permalink )The “H” piles are the steel pilings (see video and still images below) that hold the wood “lagging” to keep the earth from collapsing around the excavation. The installation of the lagging should begin early next week on the 13th and Montgomery corner of the site.

John DeAngelo